Archive for November 7th, 2008

737 Hits Production Hiccup At Renton

A new production issue has surfaced at Boeing, but the company tells FleetBuzz Editorial.com that it is working on the problem and it is not a safety of flight issue.

It has to do with a tiny part on the 737 line known as a nutplate. Nutplates are very small metallic strips with holes at either end, from which bolts are inserted to hold together components within the airplane.

The nutplates are installed by major supplier Spirit AeroSystems in Wichita, Kansas. The issue is being described a quality assurance non-conformity issue. This was apparently discovered by Spirit employees.

The anomaly pertains to a protective finishing on these nutplates that prevent corrosion. Some of these small plates have been manufactured incorrectly and are deemed “unusable” according to one Boeing Renton employee who contacted FleetBuzz Editorial.com.

Image courtesy of Boeing

There are “thousands” of affected nut plates on the 737’s currently on the assembly line in Renton, with an unspecified number of 737’s that have already been delivered to customers that may also have these non-conforming plates.

Boeing’s 737 program spokesperson Vicki Ray tells me, “Spirit AeroSystems notified Boeing that nutplates it installed on some Boeing airplane parts did not conform with applicable specifications.

Ms. Ray says that Spirit has returned to its supplier all potentially discrepant nutplates not already installed.

Boeing has determined this is not an immediate safety of flight issue and is working closely with the FAA and the supplier to rectify this situation.

As you know, we are committed to the safety of the flying public,” she says.

The strength of the nutplates remains fine, having been tested by Spirit and Boeing.

Boeing says it is assessing its delivery schedule following the IAM strike and any necessary rework will be factored into recovery plans.

Aside from delays owing to the recent IAM strike, deliveries of the 737 will not be delayed as a result of the nutplate issue says Boeing.

While not regarded as a safety issue of any kind, Boeing is working with Spirit to retrofit existing 737 fuselages that have been delivered and is replacing parts on those airplanes on the production line in Renton.

It’s not the greatest news on the heels of the recent announcement that the 787 Dreamliner will not make its long await maiden flight by the end of 2008.

But while questions have been raised about quality control, equally, the fact that these issues are being discovered and rectified points to a robust system that highlights any irregularities with a view to further tightening and enhancing that regime to ensure a higher standard of work.

Sphere: Related Content

8 comments November 7th, 2008


Calendar

November 2008
M T W T F S S
« Oct   Dec »
 12
3456789
10111213141516
17181920212223
24252627282930

Subscribe Here For Updates

Enter your email address:

Delivered by FeedBurner

Recent Posts

RSS Active FleetBuzz.com Discussions

Recent Comments

RSS Randy's Journal

Blogroll

Category Cloud

Boeing Airlines Air Travel Air Transport Boeing 787 Aerospace Aviation Airplane Airbus Airplanes Airplane Order Airport Boeing 777 Airports Aeroplane Boeing Orders Dreamliner Boeing 747-8 FleetBuzz.com Airbus A380 Airbus A350 Jet Travel Travel Boeing 787 Orders Boeing 787 Order Boeing 787 Premiere Boeing 787 Rollout British Airways 787 Orders 787 Rollout Airbus A320 787 Premiere Emirates Low Cost Airlines EADS Low Cost Carriers Dreamliner First Flight 787 First Flight Open Skies Airbus A321 Airbus A319 Airbus A318 Fleet Replacement Dubai Airshow

Archives

YouTalk

YouTalk is a new feature to the Editorial. It's your chance to write an article and discuss it with the readership. If you are a registered member on FleetBuzz.com and you would like to submit an article for publication, please send to the following: admin@fleetbuzzeditorial.com

RSS Feed

Audio


FleetBuzz Editorial

↑ Grab this Headline Animator